Texas Hill Country home exterior illustrating cohesive residential construction

Home additions

More room—designed
to belong.

Home additions for San Antonio and Texas Hill Country properties, planned to connect the new structure, exterior, building systems, and interior finishes to what is already there.

Connected by design

An addition should feel like part of the original home.

A successful addition does more than create square footage. Rooflines, foundations, utilities, circulation, exterior materials, natural light, and interior transitions all need to work together.

01

Living & family spaces

Create larger gathering areas, flex rooms, offices, or everyday spaces that improve how the home functions.

02

Primary suites

Add a coordinated bedroom, bathroom, storage, lighting, and privacy plan designed around long-term use.

03

Kitchen expansions

Extend the footprint to improve kitchen flow, pantry capacity, dining space, and the relationship to outdoor areas.

04

Garage conversions

Evaluate structure, floor height, insulation, windows, mechanical systems, and exterior changes for comfortable living space.

05

Exterior integration

Coordinate roof tie-ins, windows, masonry or siding, drainage, and architectural details with the existing home.

06

Interior connection

Resolve openings, flooring, trim, paint, lighting, and circulation so old and new spaces read as one home.

Planning the work

Feasibility comes before finishes.

Additions carry more early-stage coordination than most interior remodels. We begin by understanding the property and the constraints that shape the right solution.

Site and existing structure

Setbacks, easements, grade, utilities, foundation type, roof geometry, and existing framing affect what can be built.

Design and engineering

Plans and structural details establish how the addition connects safely and support accurate trade coordination.

Permits and utilities

Jurisdiction, septic capacity, electrical service, HVAC, plumbing, and drainage can influence scope and schedule.

Matching the home

Some existing materials can be matched closely; others require an intentional transition or broader replacement strategy.

What to expect

Clear decisions before construction. Consistent communication during it.

  1. 01

    Feasibility conversation

    We review the goal, property, current home, desired square footage, investment expectations, and likely constraints.

  2. 02

    Design and preconstruction

    The layout, structure, site requirements, building systems, selections, and permitting path are developed before field work.

  3. 03

    Detailed scope and schedule

    We coordinate trade input, clarify allowances and exclusions, and establish the sequence for connecting new work to the home.

  4. 04

    Construction and weather protection

    Site work, foundation, framing, dry-in, rough systems, and interior finishes progress with protection and communication at each stage.

  5. 05

    Integration and closeout

    We review the transition between existing and new construction, complete final details, and walk the finished space together.

Common project questions

Helpful answers before the work begins.

Every home and scope is different, but understanding the decisions ahead makes the process easier to plan.

Question 01

What happens before an addition can be priced accurately?

We first evaluate the property, existing structure, desired square footage, setbacks, utilities, foundation and roof connections, and the level of finish. Design and engineering information are usually needed before a dependable construction price and schedule can be established.

Service area

Serving San Antonio and the Texas Hill Country.

IG Carpentry & Construction works with homeowners in San Antonio, Bulverde, Boerne, Spring Branch, New Braunfels, Blanco, Canyon Lake, Marble Falls, Johnson City, Wimberley, and surrounding communities.

Explore our service areas